Course syllabus
010113036-65 ระบบอาณัติสัญญาณ (Railway Signaling System)
Course Syllabus
Data entry : Asst.Prof.Wisute Ongcunaruk
1. Course number and name
010113036-65 ระบบอาณัติสัญญาณ (Railway Signaling System)
2. Credits and contact hours
3(3-0-6)
3. Instructor’s or course coordinator’s name
Asst.Prof.Wisute Ongcunaruk
4. Text book, title, author, and year
- Alternative text books about Railway Signaling System.
5. Specific course information
- brief description of the content of the course (catalog description)
Concept of traffic management; development of railway signaling; components in signaling system; interlocking, headway calculation, train operations, future railway signaling, related systems. - prerequisites or co-requisites
- indicate whether a required, elective, or selected elective (as per Table 5-1) course in the program
Elective :
6. Specific goals for the course
- specific outcomes of instruction (e.g. The student will be able to explain the significance of current research about a particular topic.)
- CLO1 Understand the Railway Signaling Principle.
- CLO2 Understand the characteristics of Railway Signaling and the sideway equipment.
- CLO3 Understand the operation of railway signaling and the sideway equipment.
- CLO4 Understand the operation and principles of scheme plan.
- CLO5 Understand the operation and principles of absolute block.
- explicitly indicate which of the student outcomes listed in Criterion 3 or any other outcomes are addressed by the course.
ABET Student Outcome (SO) Listed in Criterion 3 Course learning outcome (CLO) SO1 an ability to identify, formulate, and solve complex engineering problems by applying principles of engineering, science, and mathematics. - CLO1 Understand the Railway Signaling Principle.
- CLO2 Understand the characteristics of Railway Signaling and the sideway equipment.
- CLO3 Understand the operation of railway signaling and the sideway equipment.
- CLO4 Understand the operation and principles of scheme plan.
- CLO5 Understand the operation and principles of absolute block.
7. Brief list of topics to be covered
| Week | Topic | Details | Activities |
|---|---|---|---|
| 1-2 | The Development of Railway Signaling | i. How railway transportation differs from other forms of transport. ii. Vital and Non-vital iii. History and Absolute block | |
| 3 | Railway System: The Overview | i. Rolling Stock, Depot, Power supply ii. Signaling iii. Communication and SCADA iv. Automatic Fare Collection (AFC) v. Track Work vi. Platform Screen Door (PSD) | |
| 4-6 | The Components of a Signaling System | i. Signals ii. Types of Train Detection iii. Point Machines | |
| 7-8 | The Components of a Signaling System | i. Automatic Train Protection (ATP) ii. Control Panel iii. Level Crossings iv. Interlockings | |
| 9-11 | Signaling system | i. Signaling Scheme Plan ii. Control table iii. Types of Signaling iv. Route Interlocking v. List of Routes vi. Simulation of Signaling system | |
| 12-14 | Headway Calculation | i. Train timetable ii. Headway determination iii. Mean Gradient iv. Headway calculation and the standard of way side equipment according to The State Railway of Thailand (SRT) | |
| 15 | Future Signaling | i. European Train Control System (ETCS) Level 1,2,3 ii. ETCS Wayside and On-Board Equipment |
8. Course Assessment
| Course assessment | Weight score (%) | Assessment tools | Date |
|---|---|---|---|
| Midterm examination | 50 | midterm examination | 30 Jan 2026 |
| Final examination | 50 | final examination | 26 Mar 2026 |
หมายเหตุ - ลำดับเนื้อหาจะมีการปรับเปลี่ยนตามความเหมาะสม